logo
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Chongqing Linde Technology Development Co., Ltd.

Sales & Support:

Home ProductsWastewater Treatment System

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes

China Chongqing Linde Technology Development Co., Ltd. certification
China Chongqing Linde Technology Development Co., Ltd. certification
Okay of all the companies that I have quoted you are the most reasonable not for price it is consisten I thank you for the time I hope to have this week good news to be able to buy this machine

—— Emmanuel from Chile

We have been doing business with Linde company for many years with high performance-cost and friendly service , such a honest factory, product are good !

—— Moses from Kenya

I love Boiler Water Treatment System, its easy operation and i can get the ultrapure water as i want. Their price is pretty good

—— David Smith

I'm Online Chat Now

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes
Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes

Large Image :  Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes

Product Details:

Place of Origin: China
Brand Name: Linde
Certification: ISO9001, CE, SGS

Payment & Shipping Terms:

Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time: 1-7working days(depand on raw materials stocking)
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: >300sets/month
Detailed Product Description
Product Name: Wastewater Treatment System Feature: Easy Operation
Application: Medical Specification Model: Professional Customization
Color: As Requested Function: Wastewater Treatment
Highlight:

wastewater treatment plant

,

waste water purification system

Terminals Wastewater Treatment System Airports Easy Operation

 

 

Supply (cooperation) method and delivery cycle

1: Determine the usage scenario. 2: Analyze the quality of contaminated water (if necessary, do laboratory analysis) 3: Determine the treatment process. 4: The supplier forecasts the price duration and governance objectives of the equipment or system. 5: The supplier and the buyer negotiate the price schedule and the governance objectives, negotiate and agree to sign the contract and pay the supplier prepayment. 6: After the equipment is produced and paid by the buyer and its agent, the payment will be made. 7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning. 8: System training for equipment use and maintenance.

Features:

1. The hospital sewage treatment equipment can be buried below the surface, and the surface can be used for greening or plaza land. Therefore, the equipment does not occupy the surface area, does not need to be built, and does not need heating and insulation.

 

2. The hospital sewage treatment equipment consists of two-stage pools, which are steel structures and adopts the first interpenetrating network anticorrosive coatings in China for anti-corrosion. It is a rubber network and a plastic network interpenetrating to form an interpenetrating network polymer. He is resistant to acids, alkalis, salt, gasoline, kerosene, aging, abrasion, and rust and rust. After the equipment is generally painted, the anti-corrosion life can reach more than 15 years.

 

3. The A/O biological treatment process in the hospital sewage treatment equipment adopts the push-flow biological contact oxidation tank, and its treatment effect is better than that of the fully mixed or the second- or third-stage series fully mixed biological contact oxidation tank. And it is smaller than the activated sludge tank, has strong adaptability to water quality, good impact resistance, stable effluent quality, and no sludge expansion.

 

1) Equipment Name: 

Domestic sewage treatment equipment

2) Applied occasions:

The equipment is mainly suitable for domestic sewage and similar industrial wastewater in residential areas, hotels, terminals, airports, shopping malls, nursing homes, schools, factories and mines.

 

3) Equipment picture:

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes 0

 

Equipment diagram:

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes 1

 

 

Flow chart:

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes 2

 

 

Installation site picture:

Terminals Wastewater Treatment System Airports Hotels Terminals Nursing Homes 3

 

Product Name Domestic sewage treatment equipment Processing capacity According to customer needs
Material Carbon steel, stainless steel Warranty 1 Year
Performance Removal of pollutants from water Delivery Time 7-15 days
Availability Customer reservation (customized according to customer requirements)

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

 

Contact Details
Chongqing Linde Technology Development Co., Ltd.

Contact Person: Ms. Xiang

Tel: +86 139 8384 9337

Send your inquiry directly to us (0 / 3000)