logo
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Chongqing Linde Technology Development Co., Ltd.

Sales & Support:

Home ProductsWastewater Treatment System

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

China Chongqing Linde Technology Development Co., Ltd. certification
China Chongqing Linde Technology Development Co., Ltd. certification
Okay of all the companies that I have quoted you are the most reasonable not for price it is consisten I thank you for the time I hope to have this week good news to be able to buy this machine

—— Emmanuel from Chile

We have been doing business with Linde company for many years with high performance-cost and friendly service , such a honest factory, product are good !

—— Moses from Kenya

I love Boiler Water Treatment System, its easy operation and i can get the ultrapure water as i want. Their price is pretty good

—— David Smith

I'm Online Chat Now

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine
OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Large Image :  OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Product Details:

Place of Origin: China
Brand Name: Linde
Certification: ISO9001, CE, SGS

Payment & Shipping Terms:

Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time: 1-7working days(depand on raw materials stocking)
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: >300sets/month
Detailed Product Description
Product Name: Sludge Drying Equipment Feature: Easy Operation
Application: Stacking Machine Specification Model: Professional Customization
Warranty: 1 Year Weight: OEM
Highlight:

wastewater treatment plant

,

waste water purification system

5.14 Sludge Drying Equipment Stacking Machine Plate Frame Machine Centrifuge Screw Press Belt Filter Press

 

Supply (cooperation) method and delivery cycle

STEP1: Determine the usage scenario.

SETP2: Analyze the quality of contaminated water (if necessary, perform laboratory analysis)

STEP3: Determine the treatment process.

4. The supplier forecasts the price duration and governance objectives of the equipment or system.

5 The supply and demand sides negotiate and negotiate the price schedule and the governance objectives, sign the contract and pay the supplier prepayment.

6. After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7. The supplier rushed to the place where the buyer needed to use the installation guidance and commissioning.

8. System training for equipment use and maintenance.

 

1) Equipment name: stacking machine

 

2) Use occasions: Suitable for sludge treatment in municipal sewage, food, beverage, chemical, leather, paper, printing and dyeing, pharmaceutical, winery and other industries

 

3) Equipment picture:

 

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 0

 

Equipment diagram:​

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 1

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 2

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 3

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 4

 

Process flow chart:​

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 5

 

 

Installation site picture:

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine 6

 

 

 

 

Advantages:

high degree of equipment automation, saving labor; easy to block during operation, low operation and maintenance cost; continuous automatic operation, automatic operation from sludge lifting, dosing, dehydration, transportation; can be unattended, suitable for high risk Explosion-proof working environment; equipment is very compact, small footprint, low infrastructure requirements, saving infrastructure and supporting investment; low equipment failure rate, long service life; large processing capacity, multiple units can be used side by side; ultra low energy consumption, processing costs Low, comprehensive treatment costs are much lower than other sludge dewatering equipment.

 

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

 